{"id":1941,"date":"2025-03-07T08:50:58","date_gmt":"2025-03-07T08:50:58","guid":{"rendered":"https:\/\/greentrust.visualwritings.nl\/team\/lieuwe-dragt\/"},"modified":"2025-07-22T06:57:55","modified_gmt":"2025-07-22T06:57:55","slug":"lieuwe-dragt","status":"publish","type":"team","link":"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/","title":{"rendered":"Lieuwe Dragt"},"content":{"rendered":"\n<div class=\"wp-block-uagb-container uagb-block-cb5e400d alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-container uagb-block-d83682fc\">\n<h1 class=\"wp-block-heading\">Lieuwe Dragt<\/h1>\n\n\n\n<h4 class=\"wp-block-heading is-style-subtitle\">Director<\/h4>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-12b76f20\">\n<div class=\"wp-block-uagb-buttons uagb-buttons__outer-wrap uagb-btn__default-btn uagb-btn-tablet__default-btn uagb-btn-mobile__default-btn uagb-block-3f426189\"><div class=\"uagb-buttons__wrap uagb-buttons-layout-wrap \">\n<div class=\"wp-block-uagb-buttons-child uagb-buttons__outer-wrap uagb-block-19b6b6b9 wp-block-button\"><div class=\"uagb-button__wrapper\"><a class=\"uagb-buttons-repeater wp-block-button__link\" aria-label=\"\" href=\"\/team\" rel=\"follow noopener\" target=\"_self\" role=\"button\"><div class=\"uagb-button__link\">Back to overview<\/div><\/a><\/div><\/div>\n<\/div><\/div>\n<\/div>\n<\/div><\/div>\n\n<div class=\"wp-block-uagb-container uagb-block-b867f301 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-container uagb-block-06b23028\">\n<p>Lieuwe has been with GreenTrust since its start in 2014. From September 2024, he is the director of GreenTrust Consultancy and sets the strategic direction for a strong team. Additionally, as an advisor, Lieuwe focuses on the financing and procurement of wind and solar parks. He also guides various PPA processes.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Being outdoors, digging my hands into the soil, and harvesting my own food gives me great satisfaction. I love the cycle of preparing the soil to sow crops, watching them grow, harvesting them, and then preparing the soil again. Nature surprises me time and again. Even though you perform the same actions, the outcome is always different. This cycle reminds me of my work and the impact on our energy supply. At GreenTrust, we grow sustainable energy to create a sustainable energy cycle.<\/p>\n<\/blockquote>\n\n\n\n<p><strong><mark style=\"background-color:#02db93\" class=\"has-inline-color\">Expertise: More than a decade of experience in complex renewable energy projects. Connector, result-oriented, always looking for a win-win result. Because of broad knowledge and experience overseeing total playing field of renewable energy projects.<\/mark><\/strong>  <\/p>\n\n\n\n<div class=\"wp-block-uagb-buttons uagb-buttons__outer-wrap uagb-btn__default-btn uagb-btn-tablet__default-btn uagb-btn-mobile__default-btn uagb-block-f7c8b9bb\"><div class=\"uagb-buttons__wrap uagb-buttons-layout-wrap \">\n<div class=\"wp-block-uagb-buttons-child uagb-buttons__outer-wrap uagb-block-3c00507c wp-block-button\"><div class=\"uagb-button__wrapper\"><a class=\"uagb-buttons-repeater wp-block-button__link\" aria-label=\"\" href=\"mailto:lieuwe.dragt@greentrust.nl\" rel=\"follow noopener\" target=\"_self\" role=\"button\"><div class=\"uagb-button__link\">Email Lieuwe<\/div><\/a><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-ef7fd3ac\">\n<figure class=\"wp-block-image size-large is-style-shadow\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"1000\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-1000x1000.jpg\" alt=\"\" class=\"wp-image-287\" srcset=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-1000x1000.jpg 1000w, https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-450x450.jpg 450w, https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg 150w, https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-120x120.jpg 120w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n<\/div><\/div>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-uagb-container uagb-block-dc5e96ac alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-container uagb-block-a5816d39\">\n<h2 class=\"wp-block-heading\">My Team<\/h2>\n\n\n\n<h5 class=\"wp-block-heading is-style-subtitle\"><\/h5>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-a2ab33f6\"><ul class=\"teamslider\"><li class=\"teammember\"><a href=\"https:\/\/greentrust.nl\/en\/team\/annelies-wesselink\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Annelies-450x450.jpg\"><h3 class=\"membername\">Annelies Wesselink<\/h3><span class=\"has-small-font-size is-style-subtitle member-function\">MT member and senior legal consultant<\/span><\/a><\/li><\/ul>\n<\/div>\n<\/div><\/div>\n\n<hr class=\"wp-block-separator has-text-color has-groen-color has-alpha-channel-opacity has-groen-background-color has-background is-style-alignfull\" style=\"margin-top:var(--wp--preset--spacing--60);margin-bottom:var(--wp--preset--spacing--60)\"\/>\n\n<h2 class=\"wp-block-heading has-text-align-center has-large-font-size\">Projects<\/h2>\n\n<h5 class=\"wp-block-heading has-text-align-center\">We Aim for Impact. This Makes the Difference<\/h5>\n<div class=\"\"><div class=\"row\"><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/citizen-wind-farm-a2-lage-rooijen\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2024\/12\/53724976113_17e2feb3b6_k-1000x667.jpg)\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/citizen-wind-farm-a2-lage-rooijen\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/BWP-A2-LAGE-ROOIJEN-Logo-WIT-1-450x207.png\" class=\"project-logo\"><\/a><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/tijmen-keesmaat\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Tijmen-150x150.jpg\" title=\"Tijmen Keesmaat\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/stan-reinders\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Stan-GT-150x150.jpg\" title=\"Stan Reinders\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/joost-cornelli\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Joost-150x150.jpg\" title=\"Joost Cornelli\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/citizen-wind-farm-a2-lage-rooijen\/\">15+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/citizen-wind-farm-a2-lage-rooijen\/\"><h2 class=\"has-donkergroen-color has-text-color\">Cooperative wind park A2 Lage Rooijen<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Since 2017, Cooperation Bommelerwaar and GreenTrust have been working on a cooperative wind park at Lage Rooijen, directly east of the A2 motorway. In January 2026, the three turbines will be officially completed. With the three wind turbines, the park will then generate enough local green energy for about 10,000 households. And is thus booster of a sustainable municipality of Maasdriel.   <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-kroningswind\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/2022-WP-Kroningswind-opening-004-1000x667.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/lisa-hoffard\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/lisa-hoffard-150x150.png\" title=\"Lisa Hoffard\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/willem-jaap-de-vries\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Willem-Jaap-19-150x150.jpg\" title=\"Willem Jaap de Vries\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-kroningswind\/\">10+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-kroningswind\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park Kroningswind<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Kroningswind is an initiative of eleven farming families on the island of Goeree-Overflakkee in South Holland. 19 wind turbines have been built with a combined capacity between 70-80MW. <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-cahermurphy\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/cahermurphy-1000x750.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/kazim-dinckan\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/kazim-greentrust-150x150.jpg\" title=\"Kazim Dinckan\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/romana-madic\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/Romana-GT-1-150x150.jpg\" title=\"Romana Madi\u0107\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-cahermurphy\/\">6+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-cahermurphy\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park Cahermurphy<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">It often blows hard in Cahermurphy, Ireland. A great place, then, for a wind park. There are now three Enercon E92 wind turbines and a fourth turbine will be added in 2025. Among other things, GreenTrust is providing the technical design, construction and management here.   <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-zeewolde\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/20201-windpark-zeewolde-ijzervlechten-1000x565.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/jeroen-boerkamps\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Jeroen-150x150.jpg\" title=\"Jeroen Boerkamps\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/romana-madic\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/Romana-GT-1-150x150.jpg\" title=\"Romana Madi\u0107\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-zeewolde\/\">2+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-zeewolde\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park Zeewolde<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Since 2020, the 220 wind turbines of wind park Zeewolde have been replaced step by step with 83 larger, more modern wind turbines. This allows most of the turbines to continue operating as usual during construction. The wind park provides green power for some 280,000 households in southern Flevoland. All old wind turbines are expected to be demolished by the end of 2026.   <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-eemshaven-se\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/windpark-eemshaven-zo-zelfklimmende-kraan-1000x501.jpeg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/tijs-boorsma\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/Tijs-150x150.jpg\" title=\"Tijs Boorsma\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/kazim-dinckan\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/kazim-greentrust-150x150.jpg\" title=\"Kazim Dinckan\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-eemshaven-se\/\">3+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-eemshaven-se\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park Eemshaven ZO<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">The construction of wind park Eemshaven Southeast was a unique project. For the first time in the world, wind turbines were erected in their entirety with a self-climbing crane! <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/solar-park-de-blauwe-poort\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/cw_20230609_6593_52973132707_o-1000x563.jpg)\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/solar-park-de-blauwe-poort\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/BLAUWE-POORT-logo-negatief-450x202.png\" class=\"project-logo\"><\/a><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/richard-verhoeff\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Richard-150x150.jpg\" title=\"Richard Verhoeff\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/christian-holdert\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Christian-150x150.jpg\" title=\"Christian Holdert\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/eva-de-zeeuw\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Eva-150x150.jpg\" title=\"Eva de Zeeuw\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/solar-park-de-blauwe-poort\/\">16+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/solar-park-de-blauwe-poort\/\"><h2 class=\"has-donkergroen-color has-text-color\">Zonneweide The Blue Gate<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Sun, water and nature characterize Solar Meadow The Blue Gate in the municipality of Laarbeek. Built in 2022, the solar meadow, with 9.5MW, generates enough green energy for about 3,000 households. <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-den-tol\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/windpark-den-tol-bouw-1000x517.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/stan-reinders\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Stan-GT-150x150.jpg\" title=\"Stan Reinders\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/tijs-boorsma\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/Tijs-150x150.jpg\" title=\"Tijs Boorsma\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/bojan-antonijevic\/\"><img decoding=\"async\" src=\"\" title=\"Bojan Antonijevi\u0107\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-den-tol\/\">5+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-den-tol\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park Den Tol<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">East of Netterden, close to the German border, lies wind park Den Tol. An initiative of six agricultural families, who eventually managed to realize nine wind turbines here. The wind farm has been in full operation since 2022. The arrival of a solar park will create an energy landscape here in the future.   <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/solar-park-de-zonnewilg\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/52294936345_7600ae9e10_k-1000x667.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/stan-reinders\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Stan-GT-150x150.jpg\" title=\"Stan Reinders\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lisa-hoffard\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/lisa-hoffard-150x150.png\" title=\"Lisa Hoffard\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/solar-park-de-zonnewilg\/\">4+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/solar-park-de-zonnewilg\/\"><h2 class=\"has-donkergroen-color has-text-color\">Solar park Zonnewilg<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Together with the nine wind turbines of Wind park Den Tol, solar park de Zonnewilg forms an energy landscape along the German border near Netterden. The solar park has a total installed capacity of about 16 MW. Since the spring of 2025, the solar park has been supplying energy.  <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-egchelse-heide\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/windpark-egchelse-heide-financial-close-1000x749.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/stan-reinders\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Stan-GT-150x150.jpg\" title=\"Stan Reinders\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/jeroen-boerkamps\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Jeroen-150x150.jpg\" title=\"Jeroen Boerkamps\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/richard-verhoeff\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Richard-150x150.jpg\" title=\"Richard Verhoeff\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-egchelse-heide\/\">8+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-egchelse-heide\/\"><h2 class=\"has-donkergroen-color has-text-color\">Egchel Heath Wind Farm<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Wind park Egchelse Heide consists of five wind turbines in the municipality of Peel and Maas. The project was realized in cooperation with the local energy cooperative Peel Energie. GreenTrust participates in this project, supported its development and provides operational management.  <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/citizen-wind-farm-spinderwind\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/windpark-open-dag-gondel-Green-Trust.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/filippos-amoiralis\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Filippos-150x150.jpg\" title=\"Filippos Amoiralis\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/tijmen-keesmaat\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Tijmen-150x150.jpg\" title=\"Tijmen Keesmaat\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/citizen-wind-farm-spinderwind\/\">6+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/citizen-wind-farm-spinderwind\/\"><h2 class=\"has-donkergroen-color has-text-color\">Cooperative wind park Spinderwind<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Members of 11 energy cooperatives in the municipality of Tilburg and region of Hart van Brabant took the initiative for a wind park in Tilburg in 2018. This together with Energiefonds Brabant. As of April 2020, the wind farm's four wind turbines provide enough renewable electricity for 7,500 households.<\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/battery-storage-egchelse-heide-2\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/05\/171001-Windpark-Krammer-115-1-1000x667.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/jorick-messink\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Jorick-150x150.jpg\" title=\"Jorick Messink\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/joost-cornelli\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Joost-150x150.jpg\" title=\"Joost Cornelli\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/jeroen-boerkamps\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Jeroen-150x150.jpg\" title=\"Jeroen Boerkamps\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/battery-storage-egchelse-heide-2\/\">5+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/battery-storage-egchelse-heide-2\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park Westerse Polder<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">After 20 years, the current wind park Westerse Polder was in need of replacement. The seven wind turbines of the existing wind park were replaced by five Enercon E-126 EP3 wind turbines. Commissioned by Investment Engineering Projects, GreenTrust handled the development, tendering and construction.  <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-waardpolder\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/windpark-waardpolder-1000x563.jpeg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-waardpolder\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park Waardpolder<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">In the North Holland Waardpolder, 19 wind turbines have made way for six larger wind turbines (type Nordex N131). Since 2020, these have been providing enough power each year for some 22,000 to 24,000 households. <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-noord-beveland\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/windpark-noord-beveland-1000x495.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/joost-cornelli\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Joost-150x150.jpg\" title=\"Joost Cornelli\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/romana-madic\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/Romana-GT-1-150x150.jpg\" title=\"Romana Madi\u0107\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-noord-beveland\/\">3+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-noord-beveland\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park North Beveland<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">The five Nordex N90 wind turbines at the former Jacoba Rippolder wind park were replaced by four Nordex N117 wind turbines in 2021. Each turbine has a capacity of 3.6 MW. Together, they form the new wind park North Beveland.<\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-delta-noord\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/windturbine-gondel-1000x700.png)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/kazim-dinckan\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/kazim-greentrust-150x150.jpg\" title=\"Kazim Dinckan\"><\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-delta-noord\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park Delta North<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Delta Noord consists of one Vestas V117 turbine that has been increased from 3.3 MW to 3.5 MW. The turbine is located in the north of the Netherlands, in between other wind farms. After construction, GreenTrust took over management.  <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-hellegatsplein\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/04\/Hellegatsplein-5-1000x750.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/jeroen-boerkamps\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Jeroen-150x150.jpg\" title=\"Jeroen Boerkamps\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/romana-madic\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/Romana-GT-1-150x150.jpg\" title=\"Romana Madi\u0107\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-hellegatsplein\/\">2+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-farm-hellegatsplein\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park Hellegatsplein<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Atop the Delta Works stands wind park Hellegatsplein. The four wind turbines have a combined installed capacity of 12 MW since 2015. Enough to provide 16,500 households in the Netherlands with sustainable electricity each year. Wind park Hellegatsplein was developed on behalf of Qurrent.   <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/battery-de-blauwe-poort\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/04\/52974184898_7214b76de3_k-1000x667.jpg)\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/battery-de-blauwe-poort\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/BLAUWE-POORT-logo-450x202.png\" class=\"project-logo\"><\/a><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/christian-holdert\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Christian-150x150.jpg\" title=\"Christian Holdert\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/peter-schoch\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Peter-150x150.jpg\" title=\"Peter Schoch\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/jorick-messink\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Jorick-150x150.jpg\" title=\"Jorick Messink\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/battery-de-blauwe-poort\/\">12+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/battery-de-blauwe-poort\/\"><h2 class=\"has-donkergroen-color has-text-color\">Battery The Blue Gate<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Solar meadow De Blauwe Poort is located in the municipality of Laarbeek. The park will receive addition of a battery storage system. This can store 2 MW of energy. GreenTrust is working on a request in principle and calculating the earnings model.   <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/floating-solar-park-bct\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/07\/Connectum-Floating-PV-at-Treeport-Zundert-NL9-1-1000x675.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/lisa-hoffard\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/lisa-hoffard-150x150.png\" title=\"Lisa Hoffard\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/klaas-guldie\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/Klaas-150x150.jpg\" title=\"Klaas Guldie\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/floating-solar-park-bct\/\">4+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/floating-solar-park-bct\/\"><h2 class=\"has-donkergroen-color has-text-color\">Floating solar park BCT<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">The floating solar park BCT is located next to Windpark BCT which is part of business park Business Centre Treeport along the A16 on the border of the Netherlands and Belgium. This floating solar park consists of 1100 solar panels. <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-park-bct\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/07\/Connectum-Floating-PV-at-Treeport-Zundert-NL9-1-1000x675.jpg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/lisa-hoffard\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/lisa-hoffard-150x150.png\" title=\"Lisa Hoffard\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/klaas-guldie\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/Klaas-150x150.jpg\" title=\"Klaas Guldie\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-park-bct\/\">6+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/wind-park-bct\/\"><h2 class=\"has-donkergroen-color has-text-color\">Wind park BCT<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">The BCT Wind Farm is part of business park Business Centre Treeport along the A16 on the border of the Netherlands and Belgium. This wind farm consists of two Nordex wind turbines, <\/h4><\/div><\/div><\/div><\/div><div class=\"col-12 col-md-6\"><div class=\"highlighted-project\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/de-ambtenaar\/\"><div class=\"highlighted-project-image\" style=\"background-image: url(https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/windpark-betonvlechten-Green-Trust-1000x750.jpeg)\"><\/div><\/a><div class=\"highlighted-project-content\"><div class=\"highlighted-project-type\"><span class=\"has-groen-color\">project<\/span><\/div><div class=\"highlighted-project-team has-groen-color\">Realised by <div class=\"teamavatars\"><a href=\"https:\/\/greentrust.nl\/en\/team\/klaas-guldie\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/Klaas-150x150.jpg\" title=\"Klaas Guldie\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/jeroen-boerkamps\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Jeroen-150x150.jpg\" title=\"Jeroen Boerkamps\"><\/a><a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg\" title=\"Lieuwe Dragt\"><\/a><a class=\"andmore\" href=\"https:\/\/greentrust.nl\/en\/projecten\/de-ambtenaar\/\">2+<\/a><\/div><\/div><div class=\"highlighted-project-titles\"><a href=\"https:\/\/greentrust.nl\/en\/projecten\/de-ambtenaar\/\"><h2 class=\"has-donkergroen-color has-text-color\">De Ambtenaar<\/h2><\/a><h4 class=\"has-donkergroen-color has-text-color is-style-subtitle\">Wind Farm De Ambtenaar was redeveloped in 2012. The 1 MW Nedwind turbine was replaced by an Enercon E-126 that produces as much as seven and a half times more energy. <\/h4><\/div><\/div><\/div><\/div><\/div><\/div>\n\n<hr class=\"wp-block-separator has-text-color has-groen-color has-alpha-channel-opacity has-groen-background-color has-background is-style-alignfull\" style=\"margin-top:var(--wp--preset--spacing--60);margin-bottom:var(--wp--preset--spacing--60)\"\/>\n\n<h2 class=\"wp-block-heading has-text-align-center has-large-font-size\">Services<\/h2>\n\n<h5 class=\"wp-block-heading has-text-align-center\">We Aim for Impact. This Makes the Difference<\/h5>\n<ul class=\"dienstenlijst dienstenlijst-parent single\"><li class=\"dienstenlijst-parent-item open\"><div class=\"dienstenlijst-image\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/contractering.png\"><\/div><h3 class=\"has-large-font-size\">Contracting<\/h3><a href=\"\" class=\"dropdown\"><i class=\"fa-solid fa-chevron-up\"><\/i><\/a><ul class=\"dienstenlijst-child\"><li class=\"dienstenlijst-child-item\"><div class=\"dienstenlijst-image\"><\/div><h3><a href=\"https:\/\/greentrust.nl\/en\/diensten\/contracting\/green-energy-contracts-cppa\/\">Green Energy Contracts (cPPA)<\/a><\/h3><\/li><\/ul><\/li><li class=\"dienstenlijst-parent-item open\"><div class=\"dienstenlijst-image\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/03\/financiering.png\"><\/div><h3 class=\"has-large-font-size\">Financial Advice<\/h3><a href=\"\" class=\"dropdown\"><i class=\"fa-solid fa-chevron-up\"><\/i><\/a><ul class=\"dienstenlijst-child\"><li class=\"dienstenlijst-child-item\"><div class=\"dienstenlijst-image\"><\/div><h3><a href=\"https:\/\/greentrust.nl\/en\/diensten\/financing\/financial-reporting-and-tax-advice\/\">Financial advice<\/a><\/h3><\/li><\/ul><\/li><\/ul>\n\n<hr class=\"wp-block-separator has-text-color has-groen-color has-alpha-channel-opacity has-groen-background-color has-background is-style-alignfull\" style=\"margin-top:var(--wp--preset--spacing--60);margin-bottom:var(--wp--preset--spacing--60)\"\/>\n\n<h2 class=\"wp-block-heading has-text-align-center has-large-font-size\">News<\/h2>\n\n<h5 class=\"wp-block-heading has-text-align-center\">Everything you want to know about new energy<\/h5>\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<hr class=\"wp-block-separator has-text-color has-groen-color has-alpha-channel-opacity has-groen-background-color has-background is-style-alignfull\" style=\"margin-top:0;margin-bottom:0\"\/>\n\n<div class=\"wp-block-cover alignfull is-light\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-achtergrondgroen-background-color has-background-dim-100 has-background-dim\"><\/span><div class=\"wp-block-cover__inner-container is-layout-constrained wp-block-cover-is-layout-constrained\">\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<ul class=\"nieuws\"><li class=\"nieuws-item\"><a href=\"https:\/\/greentrust.nl\/en\/2026\/02\/16\/lieuwe-reflecteert-hoe-gaat-het-nu-met-de-energietransitie-7\/\" class=\"postimg\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/11\/Landgoed-Eldrik-Keppel-840x420.jpg\"><\/a><div class=\"newsdate\">16 February 2026<\/div><h2 class=\"newsitem\"><a href=\"https:\/\/greentrust.nl\/en\/2026\/02\/16\/lieuwe-reflecteert-hoe-gaat-het-nu-met-de-energietransitie-7\/\">GreenTrust and Keppel Estate submit plan for wind park Keppel-Eldrik<\/a><\/h2><\/li><li class=\"nieuws-item\"><a href=\"https:\/\/greentrust.nl\/en\/2026\/02\/03\/lieuwe-reflecteert-hoe-gaat-het-nu-met-de-energietransitie-6\/\" class=\"postimg\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2026\/02\/Thumb-jaarverslag-2025-2-840x420.png\"><\/a><div class=\"newsdate\">3 February 2026<\/div><h2 class=\"newsitem\"><a href=\"https:\/\/greentrust.nl\/en\/2026\/02\/03\/lieuwe-reflecteert-hoe-gaat-het-nu-met-de-energietransitie-6\/\">515,555 tons of Co2 emissions avoided: annual report 2025<\/a><\/h2><\/li><li class=\"nieuws-item\"><a href=\"https:\/\/greentrust.nl\/en\/2026\/01\/29\/optimizing-wind-farms-by-installing-controllers\/\" class=\"postimg\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2026\/01\/CW_20251030_0528-840x420.jpg\"><\/a><div class=\"newsdate\">29 January 2026<\/div><h2 class=\"newsitem\"><a href=\"https:\/\/greentrust.nl\/en\/2026\/01\/29\/optimizing-wind-farms-by-installing-controllers\/\">Optimizing wind parks by installing controllers<\/a><\/h2><\/li><li class=\"nieuws-item\"><a href=\"https:\/\/greentrust.nl\/en\/2025\/09\/11\/lieuwe-reflects-how-is-the-energy-transition-going-now\/\" class=\"postimg\"><img decoding=\"async\" src=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/08\/7R8A6773-1-840x420.jpg\"><\/a><div class=\"newsdate\">11 September 2025<\/div><h2 class=\"newsitem\"><a href=\"https:\/\/greentrust.nl\/en\/2025\/09\/11\/lieuwe-reflects-how-is-the-energy-transition-going-now\/\">Lieuwe reflects: how is the energy transition going now?<\/a><\/h2><span class=\"has-small-font-size newsitem-author\"><i class=\"fa-solid fa-pencil\"><\/i> Written by <strong>Lieuwe Dragt<\/strong><\/span><\/li><\/ul>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-text-align-center has-large-font-size\"><\/p>\n<\/div><\/div>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lieuwe Dragt Director Lieuwe has been with GreenTrust since its start in 2014. From September 2024, he is the director of GreenTrust Consultancy and sets the strategic direction for a strong team. Additionally, as an advisor, Lieuwe focuses on the financing and procurement of wind and solar parks. He also guides various PPA processes. Being <a href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\" class=\"more-link\">&#8230;<span class=\"screen-reader-text\">  Lieuwe Dragt<\/span><\/a><\/p>\n","protected":false},"featured_media":1450,"template":"","team-categories":[23],"class_list":["post-1941","team","type-team","status-publish","has-post-thumbnail","hentry","team-categories-management-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lieuwe Dragt - GreenTrust<\/title>\n<meta name=\"description\" content=\"Lieuwe is a director of GreenTrust Consultancy. Specialist in PPAs, procurement and strategy for wind and solar projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lieuwe Dragt - GreenTrust\" \/>\n<meta property=\"og:description\" content=\"Lieuwe is a director of GreenTrust Consultancy. Specialist in PPAs, procurement and strategy for wind and solar projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/\" \/>\n<meta property=\"og:site_name\" content=\"GreenTrust\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-22T06:57:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2362\" \/>\n\t<meta property=\"og:image:height\" content=\"2362\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/team\\\/lieuwe-dragt\\\/\",\"url\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/team\\\/lieuwe-dragt\\\/\",\"name\":\"Lieuwe Dragt - GreenTrust\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/team\\\/lieuwe-dragt\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/team\\\/lieuwe-dragt\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/greentrust.nl\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Lieuwe.jpg\",\"datePublished\":\"2025-03-07T08:50:58+00:00\",\"dateModified\":\"2025-07-22T06:57:55+00:00\",\"description\":\"Lieuwe is a director of GreenTrust Consultancy. Specialist in PPAs, procurement and strategy for wind and solar projects.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/team\\\/lieuwe-dragt\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/greentrust.nl\\\/en\\\/team\\\/lieuwe-dragt\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/team\\\/lieuwe-dragt\\\/#primaryimage\",\"url\":\"https:\\\/\\\/greentrust.nl\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Lieuwe.jpg\",\"contentUrl\":\"https:\\\/\\\/greentrust.nl\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Lieuwe.jpg\",\"width\":2362,\"height\":2362,\"caption\":\"Lieuwe Dragt directeur GreenTrust\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/team\\\/lieuwe-dragt\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Team\",\"item\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/team\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Lieuwe Dragt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/\",\"name\":\"GreenTrust\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/greentrust.nl\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lieuwe Dragt - GreenTrust","description":"Lieuwe is a director of GreenTrust Consultancy. Specialist in PPAs, procurement and strategy for wind and solar projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/","og_locale":"en_US","og_type":"article","og_title":"Lieuwe Dragt - GreenTrust","og_description":"Lieuwe is a director of GreenTrust Consultancy. Specialist in PPAs, procurement and strategy for wind and solar projects.","og_url":"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/","og_site_name":"GreenTrust","article_modified_time":"2025-07-22T06:57:55+00:00","og_image":[{"width":2362,"height":2362,"url":"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/","url":"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/","name":"Lieuwe Dragt - GreenTrust","isPartOf":{"@id":"https:\/\/greentrust.nl\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/#primaryimage"},"image":{"@id":"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/#primaryimage"},"thumbnailUrl":"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe.jpg","datePublished":"2025-03-07T08:50:58+00:00","dateModified":"2025-07-22T06:57:55+00:00","description":"Lieuwe is a director of GreenTrust Consultancy. Specialist in PPAs, procurement and strategy for wind and solar projects.","breadcrumb":{"@id":"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/#primaryimage","url":"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe.jpg","contentUrl":"https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe.jpg","width":2362,"height":2362,"caption":"Lieuwe Dragt directeur GreenTrust"},{"@type":"BreadcrumbList","@id":"https:\/\/greentrust.nl\/en\/team\/lieuwe-dragt\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/greentrust.nl\/en\/"},{"@type":"ListItem","position":2,"name":"Team","item":"https:\/\/greentrust.nl\/en\/team\/"},{"@type":"ListItem","position":3,"name":"Lieuwe Dragt"}]},{"@type":"WebSite","@id":"https:\/\/greentrust.nl\/en\/#website","url":"https:\/\/greentrust.nl\/en\/","name":"GreenTrust","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/greentrust.nl\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"uagb_featured_image_src":{"full":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe.jpg",2362,2362,false],"thumbnail":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-150x150.jpg",150,150,true],"medium":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-450x450.jpg",300,300,true],"medium_large":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe.jpg",768,768,false],"large":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-1000x1000.jpg",1000,1000,true],"1536x1536":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe.jpg",1536,1536,false],"2048x2048":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe.jpg",2048,2048,false],"small":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-120x120.jpg",120,120,true],"slider":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-840x420.jpg",840,420,true],"featured":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-1200x900.jpg",1200,900,true],"square":["https:\/\/greentrust.nl\/wp-content\/uploads\/2025\/02\/Lieuwe-450x450.jpg",450,450,true]},"uagb_author_info":{"display_name":"Christine Wevers","author_link":"https:\/\/greentrust.nl\/en\/author\/"},"uagb_comment_info":0,"uagb_excerpt":"Lieuwe Dragt Director Lieuwe has been with GreenTrust since its start in 2014. From September 2024, he is the director of GreenTrust Consultancy and sets the strategic direction for a strong team. Additionally, as an advisor, Lieuwe focuses on the financing and procurement of wind and solar parks. He also guides various PPA processes. Being&hellip;","_links":{"self":[{"href":"https:\/\/greentrust.nl\/en\/wp-json\/wp\/v2\/team\/1941","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greentrust.nl\/en\/wp-json\/wp\/v2\/team"}],"about":[{"href":"https:\/\/greentrust.nl\/en\/wp-json\/wp\/v2\/types\/team"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greentrust.nl\/en\/wp-json\/wp\/v2\/media\/1450"}],"wp:attachment":[{"href":"https:\/\/greentrust.nl\/en\/wp-json\/wp\/v2\/media?parent=1941"}],"wp:term":[{"taxonomy":"team-categories","embeddable":true,"href":"https:\/\/greentrust.nl\/en\/wp-json\/wp\/v2\/team-categories?post=1941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}