Wind park Delta North
Wind turbine against dike
Delta Noord consists of one Vestas V117 turbine that has been increased from 3.3 MW to 3.5 MW. The turbine is located in the north of the Netherlands, in between other wind parks. After construction, GreenTrust took over management.
Building with strong winds
At wind turbine Delta North, the wind can be incredibly strong. Perfect for a wind turbine, but a challenge during construction. In fact, due to high winds, hoisting is not always possible. That makes planning more challenging. Building against the dike also presented an additional challenge. This necessitated slope angle measurements (cliometry). And while the piles were being driven, we had to do additional monitoring of the dike.

Delta North was the first project I got to build on my own as project manager. So very special for me. And even if it’s just one turbine, even here you hit all the bumps you normally encounter in construction. But it ended up being a nice first construction project.
Role GreenTrust
A number of GreenTrusters have been involved in wind park Delta North. Klaas did the tendering and Lieuwe managed the construction. Together they supported grid connection. Kazim does turbine management.
Team wind park Delta North
The founders of a green future