Lieuwe Dragt

Director

Lieuwe has been with GreenTrust since its start in 2014. From September 2024, he is the director of GreenTrust Consultancy and sets the strategic direction for a strong team. Additionally, as an advisor, Lieuwe focuses on the financing and procurement of wind and solar parks. He also guides various PPA processes.

Being outdoors, digging my hands into the soil, and harvesting my own food gives me great satisfaction. I love the cycle of preparing the soil to sow crops, watching them grow, harvesting them, and then preparing the soil again. Nature surprises me time and again. Even though you perform the same actions, the outcome is always different. This cycle reminds me of my work and the impact on our energy supply. At GreenTrust, we grow sustainable energy to create a sustainable energy cycle.

Expertise: More than a decade of experience in complex renewable energy projects. Connector, result-oriented, always looking for a win-win result. Because of broad knowledge and experience overseeing total playing field of renewable energy projects.


Projects

We Aim for Impact. This Makes the Difference
project
Realised by

Cooperative wind park A2 Lage Rooijen

Since 2017, Cooperation Bommelerwaar and GreenTrust have been working on a cooperative wind park at Lage Rooijen, directly east of the A2 motorway. In January 2026, the three turbines will be officially completed. With the three wind turbines, the park will then generate enough local green energy for about 10,000 households. And is thus booster of a sustainable municipality of Maasdriel.

project
Realised by

Wind park Kroningswind

Kroningswind is an initiative of eleven farming families on the island of Goeree-Overflakkee in South Holland. 19 wind turbines have been built with a combined capacity between 70-80MW.

project
Realised by

Wind park Cahermurphy

It often blows hard in Cahermurphy, Ireland. A great place, then, for a wind park. There are now three Enercon E92 wind turbines and a fourth turbine will be added in 2025. Among other things, GreenTrust is providing the technical design, construction and management here.

project
Realised by

Wind park Zeewolde

Since 2020, the 220 wind turbines of wind park Zeewolde have been replaced step by step with 83 larger, more modern wind turbines. This allows most of the turbines to continue operating as usual during construction. The wind park provides green power for some 280,000 households in southern Flevoland. All old wind turbines are expected to be demolished by the end of 2026.

project
Realised by

Wind park Eemshaven ZO

The construction of wind park Eemshaven Southeast was a unique project. For the first time in the world, wind turbines were erected in their entirety with a self-climbing crane!

project
Realised by

Zonneweide The Blue Gate

Sun, water and nature characterize Solar Meadow The Blue Gate in the municipality of Laarbeek. Built in 2022, the solar meadow, with 9.5MW, generates enough green energy for about 3,000 households.

project
Realised by

Wind park Den Tol

East of Netterden, close to the German border, lies wind park Den Tol. An initiative of six agricultural families, who eventually managed to realize nine wind turbines here. The wind farm has been in full operation since 2022. The arrival of a solar park will create an energy landscape here in the future.

project
Realised by

Solar park Zonnewilg

Together with the nine wind turbines of Wind park Den Tol, solar park de Zonnewilg forms an energy landscape along the German border near Netterden. The solar park has a total installed capacity of about 16 MW. Since the spring of 2025, the solar park has been supplying energy.

project
Realised by

Wind park Egchelse Heide

Wind park Egchelse Heide consists of five wind turbines in the municipality of Peel and Maas. The project was realized in cooperation with the local energy cooperative Peel Energie. GreenTrust participates in this project, supported its development and provides operational management.

project
Realised by

Cooperative wind park Spinderwind

Members of 11 energy cooperatives in the municipality of Tilburg and region of Hart van Brabant took the initiative for a wind park in Tilburg in 2018. This together with Energiefonds Brabant. As of April 2020, the wind farm's four wind turbines provide enough renewable electricity for 7,500 households.

project
Realised by

Wind park Westerse Polder

After 20 years, the current wind park Westerse Polder was in need of replacement. The seven wind turbines of the existing wind park were replaced by five Enercon E-126 EP3 wind turbines. Commissioned by Investment Engineering Projects, GreenTrust handled the development, tendering and construction.

project
Realised by

Wind park Waardpolder

In the North Holland Waardpolder, 19 wind turbines have made way for six larger wind turbines (type Nordex N131). Since 2020, these have been providing enough power each year for some 22,000 to 24,000 households.

project
Realised by

Wind park North Beveland

The five Nordex N90 wind turbines at the former Jacoba Rippolder wind park were replaced by four Nordex N117 wind turbines in 2021. Each turbine has a capacity of 3.6 MW. Together, they form the new wind park North Beveland.

project
Realised by

Wind park Delta North

Delta Noord consists of one Vestas V117 turbine that has been increased from 3.3 MW to 3.5 MW. The turbine is located in the north of the Netherlands, in between other wind farms. After construction, GreenTrust took over management.

project
Realised by

Wind park Hellegatsplein

Atop the Delta Works stands wind park Hellegatsplein. The four wind turbines have a combined installed capacity of 12 MW since 2015. Enough to provide 16,500 households in the Netherlands with sustainable electricity each year. Wind park Hellegatsplein was developed on behalf of Qurrent.

project
Realised by

Battery The Blue Gate

Solar meadow De Blauwe Poort is located in the municipality of Laarbeek. The park will receive addition of a battery storage system. This can store 2 MW of energy. GreenTrust is working on a request in principle and calculating the earnings model.

project
Realised by

Floating solar park BCT

The floating solar park BCT is located next to Windpark BCT which is part of business park Business Centre Treeport along the A16 on the border of the Netherlands and Belgium. This floating solar park consists of 1100 solar panels.

project
Realised by

Wind park BCT

The BCT Wind Farm is part of business park Business Centre Treeport along the A16 on the border of the Netherlands and Belgium. This wind farm consists of two Nordex wind turbines,

project
Realised by

De Ambtenaar

Wind Farm De Ambtenaar was redeveloped in 2012. The 1 MW Nedwind turbine was replaced by an Enercon E-126 that produces as much as seven and a half times more energy.