Richard Verhoeff
Team management
Richard is an operations manager with team Asset Management responsible for managing several wind parks such as wind park A2 Lage Rooijen.
I clear my head by walking. Preferably enjoying the Druten floodplains with our dog Caesar. But we also undertake longer walks outside our hometown. Furthermore, I relax by gaming. I don’t really have a favorite game, I actually like everything. My work at GreenTrust allows me to contribute to the energy transition and I think that’s important. And fortunately, the work is also a lot of fun!
Expertise: All-rounder, flexible, friendly, team player, quick adaptability, sense of responsibility, has a solid approach to problem solving and inspection master.

My Team
Projects
With my expertise, I contribute to these projects.
project
Realised by
Egchel Heath Wind Farm
Wind park Egchelse Heide consists of five wind turbines in the municipality of Peel and Maas. The project was realized in cooperation with the local energy cooperative Peel Energie. GreenTrust participates in this project, supported its development and provides operational management.
project
Wind park Ospeldijk West
Wind park Ospeldijk West is located in the municipality of Nederweert in Limburg. It consists of two Nordex Delta 4000 turbines, which together produce enough energy for about 8,000 households. GreenTrust has been involved in the construction and management of the project, among other things.
project
Realised by
Zonneweide The Blue Gate
Sun, water and nature characterize Solar Meadow The Blue Gate in the municipality of Laarbeek. Built in 2022, the solar meadow, with 9.5MW, generates enough green energy for about 3,000 households.
project
Realised by
Battery The Blue Gate
Solar meadow De Blauwe Poort is located in the municipality of Laarbeek. The park will receive addition of a battery storage system. This can store 2 MW of energy. GreenTrust is working on a request in principle and calculating the earnings model.
project
Realised by
Wind park Roosendaalsche Vliet
Wind park Roosendaalsche Vliet is an initiative of 20 farmers in the Roosendaal region. Together they invested in the construction of a wind park along the A17 motorway. Since 2016, the wind farm has been in operation and the three Vestas V90 wind turbines have a combined installed capacity of 9 MW.
project
Realised by
Cooperative wind park A2 Lage Rooijen
Since 2017, Cooperation Bommelerwaar and GreenTrust have been working on a cooperative wind park at Lage Rooijen, directly east of the A2 motorway. In January 2026, the three turbines will be officially completed. With the three wind turbines, the park will then generate enough local green energy for about 10,000 households. And is thus booster of a sustainable municipality of Maasdriel.
Services
I am happy to take care of these services.
News
Everything you want to know about new energy
16 February 2026GreenTrust and Keppel Estate submit plan for wind park Keppel-Eldrik
3 February 2026515,555 tons of Co2 emissions avoided: annual report 2025
29 January 2026Optimizing wind parks by installing controllers
19 June 2025Keep learning: the training courses for our Asset Managers




















