Filippos Amoiralis
Team management
Filippos Amoiralis is the operations manager of GreenTrust. Together with his team, he is responsible for the operational management of all wind and solar farms. In addition, he analyzes the data.
Just as I enjoy entertaining game nights with friends, in the renewable energy playing field I love challenging my team and other players to achieve the best results together. My focus is on building a strong team, focusing on attention, knowledge sharing and growth. I like to put my energy into contributing and developing good ideas so that others can take over. I always have an eye and ear for science because I want to continue to grow in everything I do. At GreenTrust, I feel at home. We share open knowledge and have the space to develop our own methods and strengthen each other. Together we are taking steps toward a more sustainable life.
Expertise: Highly creative and consistent, with a broad perspective, problem-solving and analytical. Works efficiently and is strong in both technical and commercial aspects. Knows how to make a perfect balance between innovative thinking and practical execution, ensuring high quality results in various projects.

My Team
Because without the staff, nothing can be arranged!
Projects
We Aim for Impact. This Makes the Difference
Zonneweide The Blue Gate
Sun, water and nature characterize Solar Meadow The Blue Gate in the municipality of Laarbeek. Built in 2022, the solar meadow, with 9.5MW, generates enough green energy for about 3,000 households.
Wind park North Beveland
The five Nordex N90 wind turbines at the former Jacoba Rippolder wind park were replaced by four Nordex N117 wind turbines in 2021. Each turbine has a capacity of 3.6 MW. Together, they form the new wind park North Beveland.
Wind park Egchelse Heide
Wind park Egchelse Heide consists of five wind turbines in the municipality of Peel and Maas. The project was realized in cooperation with the local energy cooperative Peel Energie. GreenTrust participates in this project, supported its development and provides operational management.
Wind park Zeewolde
Since 2020, the 220 wind turbines of wind park Zeewolde have been replaced step by step with 83 larger, more modern wind turbines. This allows most of the turbines to continue operating as usual during construction. The wind park provides green power for some 280,000 households in southern Flevoland. All old wind turbines are expected to be demolished by the end of 2026.
Cooperative wind park Spinderwind
Members of 11 energy cooperatives in the municipality of Tilburg and region of Hart van Brabant took the initiative for a wind park in Tilburg in 2018. This together with Energiefonds Brabant. As of April 2020, the wind farm's four wind turbines provide enough renewable electricity for 7,500 households.
Wind park Hartelkanaal
From 2009 to 2015, wind park Hartelkanaal was redeveloped and built on behalf of Investment Engineering Projects. The wind farm has eight wind turbines with a combined capacity of 24 MW. Special challenge: the limited location.
Wind park Roosendaalsche Vliet
Wind park Roosendaalsche Vliet is an initiative of 20 farmers in the Roosendaal region. Together they invested in the construction of a wind park along the A17 motorway. Since 2016, the wind farm has been in operation and the three Vestas V90 wind turbines have a combined installed capacity of 9 MW.
Solar park de Grift
Solar Park de Grift is located next to Wind Park Nijmegen-Betuwe, along the A15 highway near Nijmegen. As one of the first cooperative solar parks in the Netherlands, it utilizes cable pooling, where the wind park and solar park share a grid connection. With over 11,000 panels, the solar park has been providing sustainable energy for approximately 1500 households since 2022.
De Ambtenaar
Wind Farm De Ambtenaar was redeveloped in 2012. The 1 MW Nedwind turbine was replaced by an Enercon E-126 that produces as much as seven and a half times more energy.
Services
We Aim for Impact. This Makes the Difference
News
Everything you wanted to know about new energy
16 February 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
3 February 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
29 January 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
19 June 2025Continuous Learning: Training for our Asset Managers




















