Joost Cornelli
Realisation Team
Joost has been working at GreenTrust since its inception. Today, he is team leader of the construction team. He is involved in such projects as Coronation Wind Farm, Citizen Wind Farm A2 Lage Rooijen and Windmill De Noord.
The violin concertos of composer Max Bruch made me want to play the violin. I started when I was nine years old. It was quite some time before I was able to perform a concerto of his myself. A matter of continuing to practice. Knowing that I can do that makes me happy. I prefer to play together in an orchestra. Working together energizes me, including at GreenTrust. You look beyond your own interests, you help each other to measure up and you can count on each other. Together you put up something beautiful that is executed with inspiration.
Expertise: connector, pragmatic, process-oriented, procurement specialist, project leader on many procurement construction projects, years of experience in green energy

My Team
Because without the staff, nothing can be arranged!
Projects
With my expertise, I contribute to these projects.
Wind park Cahermurphy
It often blows hard in Cahermurphy, Ireland. A great place, then, for a wind park. There are now three Enercon E92 wind turbines and a fourth turbine will be added in 2025. Among other things, GreenTrust is providing the technical design, construction and management here.
Wind park Nijmegen-Betuwe
In a record time of less than four years, residents of Nijmegen and the surrounding area realized Wind park Nijmegen-Betuwe. The wind park, with four wind turbines, has been providing renewable energy for over 7,000 households per year since the end of 2016. Wind park Nijmegen-Betuwe is located on Nijmegen territory, along the A15 highway.
Windmill the North
Windmill De Noord is part of wind park Zonzeel along the A16 motorway. A unique project, as De Noord supplies electricity directly to the village of Terheijden. Through the Traais Energie Collectief, the residents of this village want to fully meet their own energy needs with locally generated sustainable energy.
Wind park Oostflakkee
Wind park Oostflakkee is an initiative of five local farmers and project developer Renewable Energy Factory. Kallista Energy purchased the wind park. With this, this French independent energy producer took its first step across the border. Wind park Oostflakkee consists of eight wind turbines (E126-EP3), which, with a capacity of 32 MW per year, provide enough green power for more than 30,000 households.
Wind park North Beveland
The five Nordex N90 wind turbines at the former Jacoba Rippolder wind park were replaced by four Nordex N117 wind turbines in 2021. Each turbine has a capacity of 3.6 MW. Together, they form the new wind park North Beveland.
Wind park Eemshaven ZO
The construction of wind park Eemshaven Southeast was a unique project. For the first time in the world, wind turbines were erected in their entirety with a self-climbing crane!
Cooperative wind park A2 Lage Rooijen
Since 2017, Cooperation Bommelerwaar and GreenTrust have been working on a cooperative wind park at Lage Rooijen, directly east of the A2 motorway. In January 2026, the three turbines will be officially completed. With the three wind turbines, the park will then generate enough local green energy for about 10,000 households. And is thus booster of a sustainable municipality of Maasdriel.
Wind park Kroningswind
Kroningswind is an initiative of eleven farming families on the island of Goeree-Overflakkee in South Holland. 19 wind turbines have been built with a combined capacity between 70-80MW.
Wind park Westerse Polder
After 20 years, the current wind park Westerse Polder was in need of replacement. The seven wind turbines of the existing wind park were replaced by five Enercon E-126 EP3 wind turbines. Commissioned by Investment Engineering Projects, GreenTrust handled the development, tendering and construction.
Zonneweide The Blue Gate
Sun, water and nature characterize Solar Meadow The Blue Gate in the municipality of Laarbeek. Built in 2022, the solar meadow, with 9.5MW, generates enough green energy for about 3,000 households.
Battery The Blue Gate
Solar meadow De Blauwe Poort is located in the municipality of Laarbeek. The park will receive addition of a battery storage system. This can store 2 MW of energy. GreenTrust is working on a request in principle and calculating the earnings model.
Wind park Hellegatsplein
Atop the Delta Works stands wind park Hellegatsplein. The four wind turbines have a combined installed capacity of 12 MW since 2015. Enough to provide 16,500 households in the Netherlands with sustainable electricity each year. Wind park Hellegatsplein was developed on behalf of Qurrent.
Floating solar park BCT
The floating solar park BCT is located next to Windpark BCT which is part of business park Business Centre Treeport along the A16 on the border of the Netherlands and Belgium. This floating solar park consists of 1100 solar panels.
Wind park Roosendaalsche Vliet
Wind park Roosendaalsche Vliet is an initiative of 20 farmers in the Roosendaal region. Together they invested in the construction of a wind park along the A17 motorway. Since 2016, the wind farm has been in operation and the three Vestas V90 wind turbines have a combined installed capacity of 9 MW.
Wind park BCT
The BCT Wind Farm is part of business park Business Centre Treeport along the A16 on the border of the Netherlands and Belgium. This wind farm consists of two Nordex wind turbines,
Services
I am happy to take care of these services.
News
Everything you wanted to know about new energy
16 February 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
3 February 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
29 January 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
23 January 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?































