Wind Park Eemshaven SE
World first: self-climbing crane
De bouw van Windpark Eemshaven Zuidoost was een uniek project. Voor de eerste keer ter wereld werden windturbines in hun geheel opgebouwd met een zelf-klimmende kraan! GreenTrust is onder andere betrokken bij de ontwikkeling, contractering en de bouw van het project.
Green Electricity for 14,000 Households
Wind Park Eemshaven Southeast consists of four Lagerwey wind turbines in the north of the Netherlands. The construction of the wind farm started in 2019 with the development of roads, cabling, foundations, and crane platforms. The construction of the four wind turbines followed at the end of 2020. Lagerwey’s self-climbing crane was used for the installation of three wind turbines, while one turbine was built using a conventional crane. The wind farm has been operational since January 2022 and supplies green electricity to about 14,000 households in Groningen.
Curious about how the self-climbing crane works? Watch the footage here.

This was an incredibly beautiful project to work on. It’s the first project where the entire wind turbine was built using a self-climbing crane, which climbs up using a ‘pinning’ system. By choosing this crane, we save in two ways: it reduces the heavy transport of a conventional crane and the space needed to set up such a crane.
Rol GreenTrust
Bij dit project is een aantal GreenTrusters betrokken. Zo werkten Lieuwe, Joost en Klaas aan de contractering, het rondmaken van de financiering en de PPA. Tijs begeleidde de bouw. Bojan en Romana hebben gewerkt aan het technisch ontwerp. Kazim beheert het windpark.
Team Wind Park Eemshaven SE
The Founders of a Green Future
News
Everything you want to know about new energy.
- 9 January 2025
The Importance of Ice Detection on Wind Turbines