energy management

7 July 2025

Full scope management goes (much) beyond maintenance and inspections

Full scope management goes (much) beyond maintenance and inspections Along the sea dike on the east side of Goeree-Overflakkee, the eight wind turbines of Windpark Oostflakkee generate enough green power each year to power about 30,000 households. GreenTrust supported power producer Kallista Energy, owner of the wind farm, during construction of the wind farm. Recently, ... Full scope management goes (much) beyond maintenance and inspections
16 April 2025

Festive start of construction of wind park A2 Lage Rooijen

Festive start of construction of wind park A2 Lage Rooijen The construction of wind park A2 Lage Rooijen has officially started. On Tuesday, April 15, the first pile was symbolically struck amid great interest. A milestone for the wind farm that is being created with the efforts of the local cooperative, residents. The wind park ... Festive start of construction of wind park A2 Lage Rooijen