management

29 January 2026

Optimizing wind parks by installing controllers

Optimizing wind parks by installing controllers At almost all wind parks under our management, we have installed controllers. These make it possible to give the energy suppliers (aka the PPA parties) more control over the production capacity of the wind parks. The controllers enable the wind parks to limit their production at different times and ... Optimizing wind parks by installing controllers
11 September 2025

On wind safari at wind park A2 Lage Rooijen

Great interest in open day Wind park A2 Lage Rooijen attracted over 400 visitors on Saturday, September 6. Neighbors and other interested parties had the chance during an open day to see how the three wind turbines of Coöperatie Bommelerwaar and GreenTrust are taking shape. On safari along the big threeWith an open bus, visitors ... On wind safari at wind park A2 Lage Rooijen
11 September 2025

Lieuwe reflects: how is the energy transition going now?

Lieuwe reflects: how is the energy transition going now? The middle of summer … the time to take a break. Time for reflection and a fresh look ahead. How are we doing? How is the energy transition going? At GreenTrust, we have programmed ourselves to accelerate the energy transition. And acceleration is not exactly how ... Lieuwe reflects: how is the energy transition going now?
Written by Lieuwe Dragt
7 July 2025

Full scope management goes (much) beyond maintenance and inspections

Full scope management goes (much) beyond maintenance and inspections Along the sea dike on the east side of Goeree-Overflakkee, the eight wind turbines of Windpark Oostflakkee generate enough green power each year to power about 30,000 households. GreenTrust supported power producer Kallista Energy, owner of the wind farm, during construction of the wind farm. Recently, ... Full scope management goes (much) beyond maintenance and inspections
16 April 2025

Festive start of construction of wind park A2 Lage Rooijen

Festive start of construction of wind park A2 Lage Rooijen The construction of wind park A2 Lage Rooijen has officially started. On Tuesday, April 15, the first pile was symbolically struck amid great interest. A milestone for the wind farm that is being created with the efforts of the local cooperative, residents. The wind park ... Festive start of construction of wind park A2 Lage Rooijen