Wind park Hartelkanaal

From 2009 to 2015, wind park Hartelkanaal was redeveloped and built on behalf of Investment Engineering Projects. The wind farm has eight wind turbines with a combined capacity of 24 MW. Special challenge: the limited location.
12 July 2025

Wind park Hazeldonk (expansion)

The three wind turbines of Windpark Hazeldonk have been operating along the A16 near Breda since 2015. After the development of this existing park, Green Trust is also involved as a consultant for the expansion with one more wind turbine.
12 July 2025

Wind park Hazeldonk

The three wind turbines of Windpark Hazeldonk have been operating along the A16 near Breda since 2015. A project that seemed impossible at first glance became a success story after all thanks to the cooperation of Izzy Projects and GreenTrust. GreenTrust is co-owner of this wind farm.
13 March 2025

Wind park Hellegatsplein

Atop the Delta Works stands wind park Hellegatsplein. The four wind turbines have a combined installed capacity of 12 MW since 2015. Enough to provide 16,500 households in the Netherlands with sustainable electricity each year. Wind park Hellegatsplein was developed on behalf of Qurrent.
17 March 2025

Energy Park Koningspleij

Energiepark Koningspleij near Arnhem consists of three wind turbines and a solar meadow. Among other things, the park provides energy for public buildings and street lighting in 18 municipalities in the Arnhem-Nijmegen region.
11 March 2025

Wind park Krammer

Wind park Krammer is the largest citizens' initiative in the Netherlands. on and around the Krammer locks, the nearly 5,000 members of cooperatives Zeeuwind and Deltawind have developed a wind park with 34 wind turbines. The wind park has an installed capacity of 102 MW, providing enough power for over 100,000 households. The power is purchased directly by Nouryon, DSM, Google and Philips.