Archives: ProjectsProjects

13 March 2025

Wind park Zeewolde

Since 2020, the 220 wind turbines of wind park Zeewolde have been replaced step by step with 83 larger, more modern wind turbines. This allows most of the turbines to continue operating as usual during construction. The wind park provides green power for some 280,000 households in southern Flevoland. All old wind turbines are expected to be demolished by the end of 2026.
13 March 2025

Solar park de Grift

Solar Park de Grift is located next to Wind Park Nijmegen-Betuwe, along the A15 highway near Nijmegen. As one of the first cooperative solar parks in the Netherlands, it utilizes cable pooling, where the wind park and solar park share a grid connection. With over 11,000 panels, the solar park has been providing sustainable energy for approximately 1500 households since 2022.
11 March 2025

Solar park Larendeel

A group of Druten entrepreneurs has teamed up with GreenTrust to initiate Solar Park Larendeel. This plan provides for a solar park that can provide 37 GWh of sustainable electricity annually. Enough for over 12,000 households in the land of Maas and Waal.
17 March 2025

Solar park Zonnewilg

Together with the nine wind turbines of Wind park Den Tol, solar park de Zonnewilg forms an energy landscape along the German border near Netterden. The solar park has a total installed capacity of about 16 MW. Since the spring of 2025, the solar park has been supplying energy.