Eva de Zeeuw
Team communications
Eva handles internal and corporate communications and works on communication projects. As an official Oosterbeker, she knows her way around the office like the back of her hand.
When it’s not raining, I can often be found on my beautiful electric boat in Amsterdam’s canals. I actually know the water routes in Amsterdam better than those on the road and prefer to explore new boating paths. I get the most energy out of it when I do this with friends or (still) strangers. I like doing this in my work as well: bringing people together to discover new paths together. If a great story comes out of that, I have a great day.
Expertise: Creative, optimistic and energetic. Experienced in (on- and offline) project campaigns, communications during development, construction and management, social media strategies, internal communications and knowledge of graphic design.

My Team
Because without the staff, nothing can be arranged!
Projects
With my expertise, I contribute to these projects.
Cooperative wind park A2 Lage Rooijen
Since 2017, Cooperation Bommelerwaar and GreenTrust have been working on a cooperative wind park at Lage Rooijen, directly east of the A2 motorway. In January 2026, the three turbines will be officially completed. With the three wind turbines, the park will then generate enough local green energy for about 10,000 households. And is thus booster of a sustainable municipality of Maasdriel.
Wind park Kroningswind
Kroningswind is an initiative of eleven farming families on the island of Goeree-Overflakkee in South Holland. 19 wind turbines have been built with a combined capacity between 70-80MW.
Zonneweide The Blue Gate
Sun, water and nature characterize Solar Meadow The Blue Gate in the municipality of Laarbeek. Built in 2022, the solar meadow, with 9.5MW, generates enough green energy for about 3,000 households.
Battery The Blue Gate
Solar meadow De Blauwe Poort is located in the municipality of Laarbeek. The park will receive addition of a battery storage system. This can store 2 MW of energy. GreenTrust is working on a request in principle and calculating the earnings model.
Wind park Oostflakkee
Wind park Oostflakkee is an initiative of five local farmers and project developer Renewable Energy Factory. Kallista Energy purchased the wind park. With this, this French independent energy producer took its first step across the border. Wind park Oostflakkee consists of eight wind turbines (E126-EP3), which, with a capacity of 32 MW per year, provide enough green power for more than 30,000 households.
Solar park Larendeel
A group of Druten entrepreneurs has teamed up with GreenTrust to initiate Solar Park Larendeel. This plan provides for a solar park that can provide 37 GWh of sustainable electricity annually. Enough for over 12,000 households in the land of Maas and Waal.
Wind park BCT
The BCT Wind Farm is part of business park Business Centre Treeport along the A16 on the border of the Netherlands and Belgium. This wind farm consists of two Nordex wind turbines,
Services
I am happy to take care of these services.
News
Everything you wanted to know about new energy
23 January 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
20 January 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
4 November 2025Continuous Learning: Training for our Asset Managers
11 September 2025Lieuwe reflecteert: hoe gaat het nu met de energietransitie?