Procurement and Grid Connection
Establishing agreements in preparation for construction
Tendering the construction of an energy project, selecting suppliers, and ensuring timely delivery of materials within set budgets requires the necessary expertise. GreenTrust provides support in this area. We also assist in choosing a suitable grid connection for a wind or solar park.
Contracting
Contracting involves the procurement of materials, equipment, and services necessary for the design, construction, and management of energy projects. This includes establishing the correct tender criteria for the project and selecting the most suitable suppliers – based on broad market knowledge and standardization that anticipates long-term risks and opportunities. For this, GreenTrust is your go-to address.
Additionally, the same team remains involved during construction to ensure that the agreements made in the contracts are effectively fulfilled.
Grid Connection Application and Strategy
There are various options for connecting a wind or solar park to the grid. These can range from a standard grid connection installed by the grid operator to a so-called 16c connection that you install independently. And from a closed distribution system to behind-the-meter deliveries. The best-fitting grid connection can vary per project. GreenTrust is happy to help you find the best solution. Together, we determine the strategy. We then also ensure execution, including guiding the process with the grid operator.
GreenTrust has a broad network of suppliers and contractors with whom we maintain a sustainable relationship. Due to these often years-long relationships, we work well together to achieve the best results for our clients.
Contracting Team
Experts in aligning rules, rights, and relationships
Projects
We aim for impact. This makes the difference.
Wind park Westerse Polder
After 20 years, the current wind park Westerse Polder was in need of replacement. The seven wind turbines of the existing wind park were replaced by five Enercon E-126 EP3 wind turbines. Commissioned by Investment Engineering Projects, GreenTrust handled the development, tendering and construction.
Cooperative wind park A2 Lage Rooijen
Since 2017, Cooperation Bommelerwaar and GreenTrust have been working on a cooperative wind park at Lage Rooijen, directly east of the A2 motorway. In January 2026, the three turbines will be officially completed. With the three wind turbines, the park will then generate enough local green energy for about 10,000 households. And is thus booster of a sustainable municipality of Maasdriel.
Wind park Delta North
Delta Noord consists of one Vestas V117 turbine that has been increased from 3.3 MW to 3.5 MW. The turbine is located in the north of the Netherlands, in between other wind farms. After construction, GreenTrust took over management.
Wind park Kroningswind
Kroningswind is an initiative of eleven farming families on the island of Goeree-Overflakkee in South Holland. 19 wind turbines have been built with a combined capacity between 70-80MW.
Wind park North Beveland
The five Nordex N90 wind turbines at the former Jacoba Rippolder wind park were replaced by four Nordex N117 wind turbines in 2021. Each turbine has a capacity of 3.6 MW. Together, they form the new wind park North Beveland.
Wind park Hellegatsplein
Atop the Delta Works stands wind park Hellegatsplein. The four wind turbines have a combined installed capacity of 12 MW since 2015. Enough to provide 16,500 households in the Netherlands with sustainable electricity each year. Wind park Hellegatsplein was developed on behalf of Qurrent.
Wind park Roosendaalsche Vliet
Wind park Roosendaalsche Vliet is an initiative of 20 farmers in the Roosendaal region. Together they invested in the construction of a wind park along the A17 motorway. Since 2016, the wind farm has been in operation and the three Vestas V90 wind turbines have a combined installed capacity of 9 MW.
Windmill the North
Windmill De Noord is part of wind park Zonzeel along the A16 motorway. A unique project, as De Noord supplies electricity directly to the village of Terheijden. Through the Traais Energie Collectief, the residents of this village want to fully meet their own energy needs with locally generated sustainable energy.
Wind park Nijmegen-Betuwe
In a record time of less than four years, residents of Nijmegen and the surrounding area realized Wind park Nijmegen-Betuwe. The wind park, with four wind turbines, has been providing renewable energy for over 7,000 households per year since the end of 2016. Wind park Nijmegen-Betuwe is located on Nijmegen territory, along the A15 highway.
Wind park Den Tol
East of Netterden, close to the German border, lies wind park Den Tol. An initiative of six agricultural families, who eventually managed to realize nine wind turbines here. The wind farm has been in full operation since 2022. The arrival of a solar park will create an energy landscape here in the future.
Wind park Ospeldijk West
Wind park Ospeldijk West is located in the municipality of Nederweert in Limburg. It consists of two Nordex Delta 4000 turbines, which together produce enough energy for about 8,000 households. GreenTrust has been involved in the construction and management of the project, among other things.
News
Everything you want to know about new energy.
11 September 2025Lieuwe reflects: how is the energy transition going now?
1 August 2024Citizen wind farm A2 Lage Rooijen reaches financial milestone