Peter Schoch
Team development
As a renewable energy development consultant, Peter is involved in wind farms, solar farms, energy storage and energy hubs across the country. Such as Zonneweide de Blauwe Poort, Zonneweide Larendeel and wind farm Egchelse Heide.
In the high mountains with those bizarre dimensions safely braving the elements. I think that’s the greatest thing there is. Ice axes, which you see in the photo, are tools for that. It is very basic. To use a combination of perseverance, strength and technique – and above all teamwork – to climb to the top via a rock ledge or ice wall. I then feel like a tiny part of that grand landscape. Year after year, see glaciers and ice walls continue to melt. That hurts. Therefore, work in on renewable energy projects.
Expertise: Strategic, reflective, specialist in permitting procedures and grants, feasibility and preliminary study specialist, environmental and stakeholder management

My Team
Projects
We Aim for Impact. This Makes the Difference
Cooperative wind park Spinderwind
Members of 11 energy cooperatives in the municipality of Tilburg and region of Hart van Brabant took the initiative for a wind park in Tilburg in 2018. This together with Energiefonds Brabant. As of April 2020, the wind farm's four wind turbines provide enough renewable electricity for 7,500 households.
Cooperative wind park A2 Lage Rooijen
Since 2017, Cooperation Bommelerwaar and GreenTrust have been working on a cooperative wind park at Lage Rooijen, directly east of the A2 motorway. In January 2026, the three turbines will be officially completed. With the three wind turbines, the park will then generate enough local green energy for about 10,000 households. And is thus booster of a sustainable municipality of Maasdriel.
Solar park Zonnewilg
Together with the nine wind turbines of Wind park Den Tol, solar park de Zonnewilg forms an energy landscape along the German border near Netterden. The solar park has a total installed capacity of about 16 MW. Since the spring of 2025, the solar park has been supplying energy.
Zonneweide The Blue Gate
Sun, water and nature characterize Solar Meadow The Blue Gate in the municipality of Laarbeek. Built in 2022, the solar meadow, with 9.5MW, generates enough green energy for about 3,000 households.
Battery storage Egchel heath
At Egchelse Heide Wind Farm, options for battery storage are being explored. The idea is a storage system with a capacity between 5 and 10 MWh.
Egchel Heath Wind Farm
Wind park Egchelse Heide consists of five wind turbines in the municipality of Peel and Maas. The project was realized in cooperation with the local energy cooperative Peel Energie. GreenTrust participates in this project, supported its development and provides operational management.
Battery The Blue Gate
Solar meadow De Blauwe Poort is located in the municipality of Laarbeek. The park will receive addition of a battery storage system. This can store 2 MW of energy. GreenTrust is working on a request in principle and calculating the earnings model.
Solar park Larendeel
A group of Druten entrepreneurs has teamed up with GreenTrust to initiate Solar Park Larendeel. This plan provides for a solar park that can provide 37 GWh of sustainable electricity annually. Enough for over 12,000 households in the land of Maas and Waal.
Wind park Kroningswind
Kroningswind is an initiative of eleven farming families on the island of Goeree-Overflakkee in South Holland. 19 wind turbines have been built with a combined capacity between 70-80MW.
Wind park Hazeldonk (expansion)
The three wind turbines of Windpark Hazeldonk have been operating along the A16 near Breda since 2015. After the development of this existing park, Green Trust is also involved as a consultant for the expansion with one more wind turbine.
Wind park Hazeldonk
The three wind turbines of Windpark Hazeldonk have been operating along the A16 near Breda since 2015. A project that seemed impossible at first glance became a success story after all thanks to the cooperation of Izzy Projects and GreenTrust. GreenTrust is co-owner of this wind farm.
Services
We Aim for Impact. This Makes the Difference
News
Everything you want to know about new energy
15 May 2025Solar park The Sun Willow commissioned
30 August 2024Laarbeek Energy communicates with feeling
12 August 2024Solar park The Sun Willow reaches financial close






























