Technical and
operational management

From technology to environment: we take care of the operational management of your energy project

Our Asset Management team takes the management of renewable energy projects off your hands. Apart from day-to-day management, we also coordinate with energy project stakeholders and keep track of financial commitments. From monitoring asset performance and coordinating resolution of deviations, to contract management, to contractual quality assurance of periodic cost statements and reports.

Technical and operational management

It takes a specific mindset and motivation to ensure that an energy park continues to operate safely, efficiently and according to expectations. We not only oversee the coordination of daily operations and the quality of maintenance, but also monitor everything related to the park – from auxiliary systems to issues with the environment.

Is communication broken? Is an installation disabled? Does an asset stand still with a temperature alert in December? Using our integrated SCADA system, we quickly identify these peculiarities and ensure that the right agreements and actions are taken. In doing so, we check whether failures show recurring patterns or indicate deviations in auxiliary systems from their optimal settings. Analyzing such deviations and suggesting improvements is part of our daily work.

Safety and environmental management

Safety, and maintaining the conditions for Health, Safety & Environment (HSE), are central to our daily work. We coordinate with our safety experts and conduct our own workplace checks during our annual inspections. During these visual inspections, we assess both the safety of the workplace and the quality of maintenance performed.

When work is performed with special equipment or in medium voltage, we approve or reject plans and certificates. We also coordinate with affected stakeholders and the environment. We also closely monitor compliance with environmental regulations. In this way, we ensure that the impact on the environment is kept to a minimum.



Projects

We Aim for Impact. This makes all the difference.
project
Realised by

Wind park Zeewolde

Since 2020, the 220 wind turbines of wind park Zeewolde have been replaced step by step with 83 larger, more modern wind turbines. This allows most of the turbines to continue operating as usual during construction. The wind park provides green power for some 280,000 households in southern Flevoland. All old wind turbines are expected to be demolished by the end of 2026.

project
Realised by

Wind park Eemshaven ZO

The construction of wind park Eemshaven Southeast was a unique project. For the first time in the world, wind turbines were erected in their entirety with a self-climbing crane!

project
Realised by

Wind park Delta North

Delta Noord consists of one Vestas V117 turbine that has been increased from 3.3 MW to 3.5 MW. The turbine is located in the north of the Netherlands, in between other wind farms. After construction, GreenTrust took over management.

project
Realised by

Wind park North Beveland

The five Nordex N90 wind turbines at the former Jacoba Rippolder wind park were replaced by four Nordex N117 wind turbines in 2021. Each turbine has a capacity of 3.6 MW. Together, they form the new wind park North Beveland.

project
Realised by

Wind park Roosendaalsche Vliet

Wind park Roosendaalsche Vliet is an initiative of 20 farmers in the Roosendaal region. Together they invested in the construction of a wind park along the A17 motorway. Since 2016, the wind farm has been in operation and the three Vestas V90 wind turbines have a combined installed capacity of 9 MW.

project
Realised by

Windmill the North

Windmill De Noord is part of wind park Zonzeel along the A16 motorway. A unique project, as De Noord supplies electricity directly to the village of Terheijden. Through the Traais Energie Collectief, the residents of this village want to fully meet their own energy needs with locally generated sustainable energy.

project
Realised by

Cooperative wind park Spinderwind

Members of 11 energy cooperatives in the municipality of Tilburg and region of Hart van Brabant took the initiative for a wind park in Tilburg in 2018. This together with Energiefonds Brabant. As of April 2020, the wind farm's four wind turbines provide enough renewable electricity for 7,500 households.

project
Realised by

Solar park de Grift

Solar Park de Grift is located next to Wind Park Nijmegen-Betuwe, along the A15 highway near Nijmegen. As one of the first cooperative solar parks in the Netherlands, it utilizes cable pooling, where the wind park and solar park share a grid connection. With over 11,000 panels, the solar park has been providing sustainable energy for approximately 1500 households since 2022.

project
Realised by

Wind park Nijmegen-Betuwe

In a record time of less than four years, residents of Nijmegen and the surrounding area realized Wind park Nijmegen-Betuwe. The wind park, with four wind turbines, has been providing renewable energy for over 7,000 households per year since the end of 2016. Wind park Nijmegen-Betuwe is located on Nijmegen territory, along the A15 highway.

project
Realised by

Egchel Heath Wind Farm

Wind park Egchelse Heide consists of five wind turbines in the municipality of Peel and Maas. The project was realized in cooperation with the local energy cooperative Peel Energie. GreenTrust participates in this project, supported its development and provides operational management.

project
Realised by

Wind park Ospeldijk West

Wind park Ospeldijk West is located in the municipality of Nederweert in Limburg. It consists of two Nordex Delta 4000 turbines, which together produce enough energy for about 8,000 households. GreenTrust has been involved in the construction and management of the project, among other things.

project
Realised by

Wind park Cahermurphy

It often blows hard in Cahermurphy, Ireland. A great place, then, for a wind park. There are now three Enercon E92 wind turbines and a fourth turbine will be added in 2025. Among other things, GreenTrust is providing the technical design, construction and management here.

project
Realised by

Solar park Larendeel

A group of Druten entrepreneurs has teamed up with GreenTrust to initiate Solar Park Larendeel. This plan provides for a solar park that can provide 37 GWh of sustainable electricity annually. Enough for over 12,000 households in the land of Maas and Waal.

project
Realised by

Wind park Oostflakkee

Wind park Oostflakkee is an initiative of five local farmers and project developer Renewable Energy Factory. Kallista Energy purchased the wind park. With this, this French independent energy producer took its first step across the border. Wind park Oostflakkee consists of eight wind turbines (E126-EP3), which, with a capacity of 32 MW per year, provide enough green power for more than 30,000 households.

project
Realised by

Wind park Westerse Polder

After 20 years, the current wind park Westerse Polder was in need of replacement. The seven wind turbines of the existing wind park were replaced by five Enercon E-126 EP3 wind turbines. Commissioned by Investment Engineering Projects, GreenTrust handled the development, tendering and construction.

project
Realised by

Floating solar park BCT

The floating solar park BCT is located next to Windpark BCT which is part of business park Business Centre Treeport along the A16 on the border of the Netherlands and Belgium. This floating solar park consists of 1100 solar panels.

Services

All of our services and capabilities at a glance.