Contract Management
From technology to environment: we take care of the operational management of your energy project
Once your project is up and running, careful contract management is essential. We ensure that agreements made are kept and improved where possible. With our experience in procurement, legal expertise and attention to detail, we ensure optimal terms and conditions – from large contracts to small but crucial agreements.
Contract Management
Once the project is operational, you must take into account the agreements of all the contractors involved. With our experience in procurement and relationship management, we ensure that your project is given the right priority, and that agreed performance indicators are met – and optimized where possible.
Not only are we strong in monitoring contracts, our extensive experience in procurement – supported by a team of FIDIC experts and lawyers – ensures excellent conditions when renewing all contracts: from IT networks to energy sales and financing. Because even the smallest deal – be it security, networking or assets – is critical. We know how crucial a seemingly small detail or technical specification can be in the functioning of the overall system.
Team management
The managers who make your energy park perform optimally
Projects
We Aim for Impact. This makes all the difference.
Zonneweide The Blue Gate
Sun, water and nature characterize Solar Meadow The Blue Gate in the municipality of Laarbeek. Built in 2022, the solar meadow, with 9.5MW, generates enough green energy for about 3,000 households.
Solar park de Grift
Solar Park de Grift is located next to Wind Park Nijmegen-Betuwe, along the A15 highway near Nijmegen. As one of the first cooperative solar parks in the Netherlands, it utilizes cable pooling, where the wind park and solar park share a grid connection. With over 11,000 panels, the solar park has been providing sustainable energy for approximately 1500 households since 2022.
Wind park North Beveland
The five Nordex N90 wind turbines at the former Jacoba Rippolder wind park were replaced by four Nordex N117 wind turbines in 2021. Each turbine has a capacity of 3.6 MW. Together, they form the new wind park North Beveland.
Wind park Egchelse Heide
Wind park Egchelse Heide consists of five wind turbines in the municipality of Peel and Maas. The project was realized in cooperation with the local energy cooperative Peel Energie. GreenTrust participates in this project, supported its development and provides operational management.
Wind park Zeewolde
Since 2020, the 220 wind turbines of wind park Zeewolde have been replaced step by step with 83 larger, more modern wind turbines. This allows most of the turbines to continue operating as usual during construction. The wind park provides green power for some 280,000 households in southern Flevoland. All old wind turbines are expected to be demolished by the end of 2026.
Cooperative wind park Spinderwind
Members of 11 energy cooperatives in the municipality of Tilburg and region of Hart van Brabant took the initiative for a wind park in Tilburg in 2018. This together with Energiefonds Brabant. As of April 2020, the wind farm's four wind turbines provide enough renewable electricity for 7,500 households.
Wind park Hartelkanaal
From 2009 to 2015, wind park Hartelkanaal was redeveloped and built on behalf of Investment Engineering Projects. The wind farm has eight wind turbines with a combined capacity of 24 MW. Special challenge: the limited location.
Wind park Delta North
Delta Noord consists of one Vestas V117 turbine that has been increased from 3.3 MW to 3.5 MW. The turbine is located in the north of the Netherlands, in between other wind farms. After construction, GreenTrust took over management.
Wind park Eemshaven ZO
The construction of wind park Eemshaven Southeast was a unique project. For the first time in the world, wind turbines were erected in their entirety with a self-climbing crane!
Windmill the North
Windmill De Noord is part of wind park Zonzeel along the A16 motorway. A unique project, as De Noord supplies electricity directly to the village of Terheijden. Through the Traais Energie Collectief, the residents of this village want to fully meet their own energy needs with locally generated sustainable energy.
Wind park Cahermurphy
It often blows hard in Cahermurphy, Ireland. A great place, then, for a wind park. There are now three Enercon E92 wind turbines and a fourth turbine will be added in 2025. Among other things, GreenTrust is providing the technical design, construction and management here.
Wind park Roosendaalsche Vliet
Wind park Roosendaalsche Vliet is an initiative of 20 farmers in the Roosendaal region. Together they invested in the construction of a wind park along the A17 motorway. Since 2016, the wind farm has been in operation and the three Vestas V90 wind turbines have a combined installed capacity of 9 MW.
Wind park Ospeldijk West
Wind park Ospeldijk West is located in the municipality of Nederweert in Limburg. It consists of two Nordex Delta 4000 turbines, which together produce enough energy for about 8,000 households. GreenTrust has been involved in the construction and management of the project, among other things.
Solar park Larendeel
A group of Druten entrepreneurs has teamed up with GreenTrust to initiate Solar Park Larendeel. This plan provides for a solar park that can provide 37 GWh of sustainable electricity annually. Enough for over 12,000 households in the land of Maas and Waal.
Wind park Oostflakkee
Wind park Oostflakkee is an initiative of five local farmers and project developer Renewable Energy Factory. Kallista Energy purchased the wind park. With this, this French independent energy producer took its first step across the border. Wind park Oostflakkee consists of eight wind turbines (E126-EP3), which, with a capacity of 32 MW per year, provide enough green power for more than 30,000 households.
News
Everything you wanted to know about new energy
3 March 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
24 February 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
20 February 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?
16 February 2026Lieuwe reflecteert: hoe gaat het nu met de energietransitie?